chore(deps): update dependency mix_audit to v2.1.2 #28

Merged
james merged 1 commit from renovate/mix_audit-2.x-lockfile into main 2024-03-14 14:43:45 +13:00
Collaborator

This PR contains the following updates:

Package Update Change
mix_audit patch 2.1.1 -> 2.1.2

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | [mix_audit](https://hex.pm/packages/mix_audit) | patch | `2.1.1` -> `2.1.2` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [x] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIwLjAuMC1zZW1hbnRpYy1yZWxlYXNlIiwidXBkYXRlZEluVmVyIjoiMC4wLjAtc2VtYW50aWMtcmVsZWFzZSIsInRhcmdldEJyYW5jaCI6Im1haW4ifQ==-->
renovate added 1 commit 2024-03-14 13:38:35 +13:00
chore(deps): update dependency mix_audit to v2.1.2
Some checks failed
continuous-integration/drone/push Build is passing
continuous-integration/drone/pr Build is failing
79b38d8ff4
renovate scheduled this pull request to auto merge when all checks succeed 2024-03-14 13:38:35 +13:00
james merged commit 68fa5d87c5 into main 2024-03-14 14:43:45 +13:00
james deleted branch renovate/mix_audit-2.x-lockfile 2024-03-14 14:43:46 +13:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: james/ash_cubdb#28
No description provided.