chore(deps): update dependency ash to == 3.0.0-rc.7 - autoclosed #43

Closed
renovate wants to merge 2 commits from renovate/ash-3.x into main
Collaborator

This PR contains the following updates:

Package Update Change
ash patch == 3.0.0-rc.5 -> == 3.0.0-rc.7

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | [ash](https://hex.pm/packages/ash) | patch | `== 3.0.0-rc.5` -> `== 3.0.0-rc.7` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIwLjAuMC1zZW1hbnRpYy1yZWxlYXNlIiwidXBkYXRlZEluVmVyIjoiMC4wLjAtc2VtYW50aWMtcmVsZWFzZSIsInRhcmdldEJyYW5jaCI6Im1haW4ifQ==-->
renovate added 1 commit 2024-04-02 05:20:56 +13:00
chore(deps): update dependency ash to == 3.0.0-rc.6
Some checks failed
renovate/artifacts Artifact file update failure
continuous-integration/drone/pr Build is failing
continuous-integration/drone/push Build is failing
650274c36a
renovate scheduled this pull request to auto merge when all checks succeed 2024-04-02 05:20:57 +13:00
Author
Collaborator

⚠ Artifact update problem

Renovate failed to update an artifact related to this branch. You probably do not want to merge this PR as-is.

♻ Renovate will retry this branch, including artifacts, only when one of the following happens:

  • any of the package files in this branch needs updating, or
  • the branch becomes conflicted, or
  • you click the rebase/retry checkbox if found above, or
  • you rename this PR's title to start with "rebase!" to trigger it manually

The artifact failure details are included below:

File name: mix.lock
Command failed: mix deps.update ash
** (Mix) Hex dependency resolution failed

### ⚠ Artifact update problem Renovate failed to update an artifact related to this branch. You probably do not want to merge this PR as-is. ♻ Renovate will retry this branch, including artifacts, only when one of the following happens: - any of the package files in this branch needs updating, or - the branch becomes conflicted, or - you click the rebase/retry checkbox if found above, or - you rename this PR's title to start with "rebase!" to trigger it manually The artifact failure details are included below: ##### File name: mix.lock ``` Command failed: mix deps.update ash ** (Mix) Hex dependency resolution failed ```
james was assigned by renovate 2024-04-02 06:20:28 +13:00
renovate changed title from chore(deps): update dependency ash to == 3.0.0-rc.6 to chore(deps): update dependency ash to == 3.0.0-rc.7 2024-04-02 10:20:55 +13:00
renovate force-pushed renovate/ash-3.x from 650274c36a to 06cb7e7848 2024-04-02 10:20:57 +13:00 Compare
renovate changed title from chore(deps): update dependency ash to == 3.0.0-rc.7 to chore(deps): update dependency ash to == 3.0.0-rc.7 - autoclosed 2024-04-02 11:20:31 +13:00
renovate closed this pull request 2024-04-02 11:20:31 +13:00
Some checks failed
renovate/artifacts Artifact file update failure
continuous-integration/drone/pr Build is failing
continuous-integration/drone/push Build is failing

Pull request closed

Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: james/ash_cubdb#43
No description provided.